Recently, Fang Ning, the head of the government procurement center of the Central Government Organs (hereinafter referred to as the “National Mining Centerâ€), said that in 2012, the National Mining Center officially launched the evaluation feedback mechanism. Since its implementation, there have been four central centers. The unit of the ministry submitted the test request and conducted a total of 5 tests. “The third-party testing carried out by the National Mining Center has been approved by the purchaser. In 2013, the State Mining Center will further improve the third-party testing related systems and work in the fixed-point procurement of furnitureâ€. The test is approved by the purchaser The pilot implementation of third-party testing is the biggest change in the implementation of the fixed-point procurement of office furniture in the National Mining Center in 2012, and it is also a new initiative launched by the National Mining Center in 2012. If the purchase unit's purchase amount is between RMB 50 and RMB 1.2 million, it may entrust the National Furniture and Indoor Environmental Quality Supervision and Inspection Center that has signed a strategic cooperation agreement with the State Mining Center for testing and testing costs. It is undertaken by the National Mining Center. Fang Ning said that when the State Office purchased a batch of office furniture, it invited the testing institutions to carry out the whole process of testing, including raw materials, production processes and finished products, and obtained good test results. It is understood that the Chinese Academy of Education purchases a batch of furniture, and invites the testing organization to conduct the finished product inspection before the acceptance, and finds that the product is unqualified, and returns all the products to the supplier for re-production. The products are all tested during the re-inspection. Fang Ning said, “This really sounds the alarm for suppliers. In the fixed-point procurement, some suppliers are trying to get away with it. This unscrupulous attitude may make suppliers accumulate in the government procurement market. Credibility is zero, and it cannot be established in the government procurement market for a long time." Testing indicators must be scientific and reasonable It is understood that in the process of testing, some purchasing units have proposed higher testing technical indicators. Some testing technical indicators deviate from the actual, and some are far higher than the national standards. If the individual testing requirements are too high, 95% of the products on the market will not meet the requirements. In this regard, the director of the National Furniture and Indoor Environmental Quality Supervision and Inspection Center told reporters that there are generally three basis for furniture commissioned testing, one is the standard, including national standards and industry standards; the second is based on the provisions of the bidding documents; It is necessary to respond according to the bidding documents. If the bidding documents make a higher commitment than the bidding documents, they need to be tested according to higher standards. Fang Ning said that in 2013, it will further improve the third-party testing related systems and work in the fixed-point procurement of furniture, and do a good job in product testing, not only the cooperation of suppliers, but also the purchasing unit should pay attention to the scientific and rationality of the testing program. Raw material testing is the most critical According to reports, when the testing institutions entrusted by the State Mining Center provide testing services for the central ministries and commissions, they are divided into two types, one is the sampling inspection of finished products before acceptance, and the other is full-process testing, which includes raw materials and semi-finished products in production. And finished product sampling. Luo Wei said that the inspection should focus on two aspects. The first is raw materials. It is necessary to determine whether the raw materials have not been replaced, and whether the raw materials are filled with water. For example, if the requirement is particle board, whether the product provided becomes a medium density board, the thickness of the steel sheet is required to be 1.5 mm, and the thickness is sufficient. Second, it is necessary to verify whether the technical indicators meet the actual requirements. “In general, if the raw materials can be tested before the production, there will be basically no problems in the later stage, so the detection of various raw materials is the most critical.†Source: Government Procurement Information Network 555dddcddd Woman Wedding Dress,Romantic Woman Wedding Dress,Women Cheap Wedding Dresses,Sexy Woman Wedding Dress Bossgoo Wedding Company Co., Ltd. , https://www.bossgoodemo.com